The Project is designed with a minimum capacity of 30 ton per year or 5 milion pcs per year located at Java Integrated Industrial and Port Estate (JIIPE) Gresik, East Java, Indonesia and it will be dedicated to fullfilling the Owner’s requirements for factory modernization that enable to produce standard and high quality minted gold in order to meet the forecast demand absorption for investment gold so that it is more effective and efficient.
Project Description
Owner | PT. ANTAM TBK |
Handover Location |
Java Integrated Industrial and
Port Estate (JIIPE), Gresik, East Java |
Term of Work | 120 Workdays |
Scope Of Work
1. Interim Report 1
Previous FS Document Review Report (On Progress)
Pre-liminary Plant Layout Report (On Progress)
Technology Selection Report (On Progress)
Pre-liminary Cost Estimation Report (On Progress)
2. Interim Report 2
Architectural Design (On Progress)
Mechanical, Electrical, and Plumbing System Design (On Progress)
Plant Equipment Design (On Progress)
Renewable Energy Systems (On Progress)
Information Systems and MRP (On Progress)
Security Plan (On Progress)
Hazard Identification (HAZID) & Hazard and Operability (HAZOP) Documents (On Progress)
Risk Management (On Progress)
Cost Estimation (On Progress)
3. Final Report
On Progress