Construction Storage Tank 2×250 KL

The work activity “Fuel Storage 2x250KL” is a construction work for the manufacture of liquid fuel storage with a total capacity of 500,000 Liters PT Multi Tambangjaya Utama (MUTU).

Project Description

Owner PT. MUTU (Multi Tambangjaya Utama)
Handover Location Swalang, North Barito Regency, Central Kalimantan
Term of Work 6 months or 180 days
Warranty 3 months or 90 Calendar Days

Scope Of Work

1. Calculation and Engineering Design
On Progress
2. Civil Works (Bore Pile, Foundation, Bund Wall and Perimeter Fence)
On Progress
3. Fabrication Storage Fuel Tank 2X250 KL
On Progress
4. Pipework & Fire Fighting Systems
On Progress
5. Electrical, Lighting and Lightning Protection System
On Progress
6. Painting, Testing & Reporting
On Progress

SHARE THIS :