Secure your facility’s operational reliability 24/7. As an integrated plant utility contractor, PT Tri Daya Maxima executes MEP and industrial utility installations strictly adhering to PUIL/NFPA standards, delivering high-precision, robust, and energy-efficient infrastructure.
A poor utility system is a ticking time bomb for production downtime. We design installations that are precise, easy to maintain, and energy-efficient.
01
02
03
04

Electrical power system analysis.

3D piping and cable drafting.

HVAC cooling load calculations.

Process Piping Code.

General Requirements for Electrical Installations.

National Fire Protection Association.

Standar Nasional Indonesia.
Avoid fire risks and energy waste caused by haphazard installations. Consult your plant’s electrical, piping, and HVAC systems with our expert team today.