Front End Engineering Design

The Project is designed with a minimum capacity of 30 ton per year or 5 milion pcs per year located at Java Integrated Industrial and Port Estate (JIIPE) Gresik, East Java, Indonesia and it will be dedicated to fullfilling the Owner’s requirements for factory modernization that enable to produce standard and high quality minted gold in order to meet the forecast demand absorption for investment gold so that it is more effective and efficient.

Project Description

Owner PT. ANTAM TBK
Handover Location Java Integrated Industrial and Port Estate (JIIPE),
Gresik, East Java
Term of Work 120 Workdays

Scope Of Work

1. Interim Report 1
Previous FS Document Review Report 100%
Pre-liminary Plant Layout Report 100%
Technology Selection Report 100%
Pre-liminary Cost Estimation Report 100%
2. Interim Report 2
Architectural Design 100%
Mechanical, Electrical, and Plumbing System Design 100%
Plant Equipment Design 100%
Renewable Energy Systems 100%
Information Systems and MRP 100%
Security Plan 100%
Hazard Identification (HAZID) & Hazard and Operability (HAZOP) Documents 100%
Risk Management 100%
Cost Estimation 100%