The Project is designed with a minimum capacity of 30 ton per year or 5 milion pcs per year located at Java Integrated Industrial and Port Estate (JIIPE) Gresik, East Java, Indonesia and it will be dedicated to fullfilling the Owner’s requirements for factory modernization that enable to produce standard and high quality minted gold in order to meet the forecast demand absorption for investment gold so that it is more effective and efficient.
Project Description
Owner | PT. ANTAM TBK |
Handover Location |
Java Integrated Industrial and
Port Estate (JIIPE), Gresik, East Java |
Term of Work | 120 Workdays |
Scope Of Work
1. Interim Report 1
Previous FS Document Review Report
100%
Pre-liminary Plant Layout Report
100%
Technology Selection Report
100%
Pre-liminary Cost Estimation Report
100%
2. Interim Report 2
Architectural Design
100%
Mechanical, Electrical, and Plumbing System Design
100%
Plant Equipment Design
100%
Renewable Energy Systems
100%
Information Systems and MRP
100%
Security Plan
100%
Hazard Identification (HAZID) & Hazard and Operability (HAZOP) Documents
100%
Risk Management
100%
Cost Estimation
100%