Fabrication & Installation FAME Tank 3×50 KL

Project Description

Owner PT. Aneka Kimia Raya
Handover Location AKR Terminal Banjarmasin, South Kalimantan
Term of Work 120 (one hundred and twenty) calendar days
Bank Guarantee Advance Payment Bond & Performance Bond
Warranty 12 (twelve) months after the work is completed

Scope Of Work

Calculation and Engineering Design 100%
Civil Works (Pedestal Foundations) 100%
Fabrication FAME Tank 3X50 KL 100%
Pipework, Painting, Testing & Reporting 100%

SHARE THIS :