Project Description
| Owner | PT. Aneka Kimia Raya |
| Handover Location | AKR Terminal Banjarmasin, South Kalimantan |
| Term of Work | 120 (one hundred and twenty) calendar days |
| Bank Guarantee | Advance Payment Bond & Performance Bond |
| Warranty | 12 (twelve) months after the work is completed |
Scope Of Work
Calculation and Engineering Design
100%
Civil Works (Pedestal Foundations)
100%
Fabrication FAME Tank 3X50 KL
100%
Pipework, Painting, Testing & Reporting
100%






